Before you start
Steps to schedule End of Month
- Tick each module you want to run
- Ensure the Reports option is set to *ALL or *NO as required
- Set the Scheduled Date and Time
- Select *ALL to run EOM reports for that entity and have them emailed on completion.
- Select *NO if you plan to run reports separately.
- The time field must be entered in HHMMSS 24‑hour format (for example, 10:00 pm is 220000).
- The system defaults the scheduled time to approximately 10–15 minutes from the current time.
Recommended Module Roll Sequence
For accurate period control and consistent posting across the system, the following modules should be rolled together at month end:
- Accounts Payable
- Accounts Receivable
- Job Costing
- General Ledger
Rolling these modules at the same time ensures all subledgers remain aligned with the General Ledger and prevents transactions from being posted into closed periods and causing imbalances.
Fixed Assets
If your organization uses plant timesheets, the Fixed Assets module should be rolled before or at the same time as the modules listed above. This ensures all plant‑related costs and depreciation entries post into the correct period. If the module is used entirely for fixed asset register and depreciation, this can be rolled at a later point in time.
Payroll
The payroll module can be rolled independently. The timing depends on when payroll costs should be recognised in the General Ledger. You may roll payroll earlier or later than other modules as long as payroll journals are posted to the correct GL period.